Kane Area School District Biomass Project
The KASD Biomass Project is an alternative fuel heating project designed to reduce heating costs at the Kane Area High School.
Project Details (Adobe PDF file)
General Contractor: Highlander Energy
HVAC Contractor: RABE Environmental Systems, Inc.
Electrical Contractor: ELCO Electric
Pre-Construction Site
|
|
|
|
|
|
||||
Digging the hole
|
|
|
|
|
|
|
|
|
|
Footer
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Laying Block
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Piping runs
|
|
|
|
|
Pouring the floor
|
|
|
|
|
Erecting Steel
|
|
|
||
Machinery Install
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Pipes to High School Boiler Room
|
|
|
|
|
External Building
|
|
|
|
|
|
||||
Internal Building
|
|
|
|
|
|
||||
Pipes and conduit in High School Vo-Ag Building
|
|
|||
Getting a load of chips
|
|
|
|
|
Lighting the fire
|
||||